milsko/src/backend
IoIxD b9933b70e2
All checks were successful
pyrite-dev/milsko/pipeline/head This commit looks good
wayland: on resize, fire draw before resize
2026-03-23 15:56:01 -07:00
..
.gitignore Unfinished Wayland PR (#1) 2025-12-09 20:11:01 -06:00
call.c revert the removal of MwLLBeginDraw/EndDraw, turns out the newer system still doesn't please weston and likely other compositors 2026-03-19 16:05:44 -07:00
cocoa.m revert the removal of MwLLBeginDraw/EndDraw, turns out the newer system still doesn't please weston and likely other compositors 2026-03-19 16:05:44 -07:00
gdi.c fix math 2026-03-24 04:34:10 +09:00
wayland.c wayland: on resize, fire draw before resize 2026-03-23 15:56:01 -07:00
x11.c fix math 2026-03-24 04:34:10 +09:00